Skip to content
Search for:
Tectura Architects
  • Practice
  • Our Work
  • News
  • Contact

Author: [email protected]

STEMpowered: Women in STEM exhibition a great success

STEMpowered: Women in STEM exhibition a great success

As part of Tectura’s ongoing commitment and interest in improving STEM education opportunities across Victoria, Tectura Principal Elizabeth Grigg and Associate Melika Grigg-Baycan were central figures in the conception and realisation of STEMpowered Women in STEM Exhibition. Developed in conjunction with Her Place Women’s Museum, of which Elizabeth Grigg was a former board member, the…

December 21, 2020 by [email protected] Uncategorised
Facebook
Twitter
Google+
LinkedIn
Pinterest
Read more

Blackburn High School enters documentation stage

Blackburn High School enters documentation stage

The new Blackburn High School’s STEM Centre is a new learning and enquiry building set to start construction in 2021. Set within beautifully landscaped grounds, the new STEM centre brings advanced pedagogical and educational capabilities to Blackburn High School. The project is a culmination of the continued cooperation between Tectura and the VSBA as well…

December 9, 2020 by [email protected] Uncategorised
Facebook
Twitter
Google+
LinkedIn
Pinterest
Read more

Construction finished at Mulgrave Primary School

Construction finished at Mulgrave Primary School

Tectura Architects are proud to announce that the new gymnasium at Mulgrave Primary School has finished construction as of the 21st of September 2020. With a planned opening at the start of term 4, the facility is a much needed upgrade to its undersized predecessor, allowing the school to host local sporting groups and integrate…

September 21, 2020 by [email protected] Uncategorised
Facebook
Twitter
Google+
LinkedIn
Pinterest
Read more

Oakleigh Primary School Redevelopment opens doors to public

Oakleigh Primary School Redevelopment opens doors to public

The Oakleigh Primary School Redevelopment finished construction on 29th of May. The completed facilities over 2 years and in 3 stages, includes a new gymnasium and the renovation of both the preschool, the BER building and main classroom block, which was completed in two separate stages. The extensive staged works were completed on a very…

May 29, 2020 by [email protected] Uncategorised
Facebook
Twitter
Google+
LinkedIn
Pinterest
Read more
Contacts
  • Address: Level 6, 55 Exhibition StMelbourne VIC 3000 Australia
  • Phones: +61 (03) 9654 5444
  • E-mail: [email protected]
Tectura Architects © 2021.
  • Instagram
  • Linkedin